ON-SITE FACTORS CAUSING CONSTRUCTION WORKS DELAYS IN INDONESIA

  • ANDI ANDI Dept. of Civil Engineering, Petra Christian University, Indonesia
  • Dony LALITAN Dept. of Civil Engineering, Petra Christian University, Indonesia
  • Vincentius R. LOANATA Dept. of Civil Engineering, Petra Christian University, Indonesia

Abstract

Delays in construction works may be caused by common or specific on-site factors. The aim of this research is to represent common and specific on-site factors frequently causing delays in structural and finishing works. Data for analysis were gathered by distributing questionnaire to contractors and owners. Results show that some factors specifically cause delays in structural and finishing works; meanwhile changes in design and shop drawing approval process are two most common factors causing delays in both construction works.

Published
2009-07-25
How to Cite
ANDI, ANDI; LALITAN, Dony; R. LOANATA, Vincentius. ON-SITE FACTORS CAUSING CONSTRUCTION WORKS DELAYS IN INDONESIA. EACEF - International Conference of Civil Engineering, [S.l.], v. 1, p. 99-103, july 2009. Available at: <http://proceeding.eacef.com/ojs/index.php/EACEF/article/view/42>. Date accessed: 07 aug. 2020.
Section
Group of Construction Management